Experiment code AICRP Exp. no. 3.1.3.M
Experiment Title Fertigation scheduling for quality fruit production of mango
Research Type AICRP Research
Experiment Background NA
Experiment Group Horticulture
Unit Type (01)RESEARCH UNIT
Unit (58)AGRICULTURE EXPERIMENTAL STATION (PARIA)
Department (284)Agriculture Experimental Station Paria
BudgetHead (325/02014/05)325/27/REG/03100
Objective

i. To improve fruit yield and quality of mango

ii. To get more returns per unit area from mango orchard

Season Perennial
Location Unit Type (01)RESEARCH UNIT
Location Unit (58)AGRICULTURE EXPERIMENTAL STATION (PARIA)
Location Department (284)Agriculture Experimental Station Paria
Plot No Block-7
PI Name (NAU-EMP-2019-000716)ASHISHKUMAR HASMUKHBHAI PATEL
PI Email ashishpatel@nau.in
PI Mobile 9427122736
Year of Approval 2011
Commencement Year 2013
Completion Year 2030
Design of Experiment

RBD

Crop Spacing (cm x cm)

8 m x 8 m 

Gross Plot (m x m) NA
Net Plot (m x m) NA
Total Experiment Area (m2) NA
Plot History Last Three Year

New plantation

Initial Soil Sample Analysis Report

NA

Initial Soil Sample Analysis Report Attachment Attachment Not Available!
Layout Plan

NA

Layout Plan Attachment Attachment Not Available!
Treatment

Sr.No.

Treatment details

T1

Control as per recommended fertilizer dose (after harvest) in basin

t2

N-40 %

N-40 %

N-20 %

P-60 %

P-40 %

-

K-20  %   through drip after harvest

K-20  %   during fruit set (Nov)

K-60  %    marble size stage

T3

N-25 %

N-20 %

N-30 %

P-50 %

P-25 %

-

K-15  %   through drip after harvest

K-15  %   pre flowering (Nov)

K-45  %    marble size stage

T4

N-20 %

N-20 %

N-10 %

P-30 %

P 20 %

-

K-10   %   through drip after harvest

K-10   %   pre flowering (Nov)

K-30  %    marble size stage

T5

N-10 %

N-10 %

N-05 %

P-20 %

P-05 %

-

K-5   %   through drip after harvest

K-5  %   pre flowering (Nov)

K-15  %    marble size stage

Treatment Attachment Attachment Not Available!
(NAU-EMP-2015-000855) ANKITKUMAR JAGDISHBHAI BHANDARI ajbhandari@nau.in 9033171336 08-12-2021 01/08/2024
(NAU-EMP-2019-000716) ASHISHKUMAR HASMUKHBHAI PATEL ashishpatel@nau.in 9427122736 01/08/2024
Active
Mango Kesar